A "roll test" was done on Thursday to check the stabilization work. Two "soft" spots were found and are being repaired today (Friday). Paving is scheduled for Monday followed by painting, sealing of the other areas (if the PO request is approved) and replacing the grass along the curbs. Should be done next week.
--
Rick Smith,
Twinsburg Public Library
Friday, September 14, 2007